Saturday, May 12, 2007
Previous Posts
- With epoxy glue applied in between the servo tab t...
- Blind riveting the top servo skin to the spar with...
- Close up view of the inspection doubler in place.
- After riveting the lower servo tab to the spar .
- The trailing edge joggle is drilled with #40 bit w...
- Here, the inspection doublers are being riveted to...
- This is the second doubler riveted to the spar.
- Riveting the inspection doubler on the spar.
- With all nose and aft ribs riveted to the spar..
- Riveting the nose ribs to the spar. Note some un...
0 Comments:
Post a Comment
<< Home