1.Rudder minus counterweight
2.Horizontal stabilizer
3.Ailerons
4. Elevator ( half way there- major project plus interrupted by my one month annual leave in mid Aug- 1 wk holiday in Christchurch and 2 weeks in Malaysia to build wing and flap there )
5. one flap - drilling completed except for corrosion proofing + riveting
& left wing with top skin drilled and clecoed at few places.
Aside, the photo shows both ailerons side by side with the trailing edge clamped w/ epoxy applied overnight b4 rivet process.