Monday, September 10, 2007
Previous Posts
- Checking that the flap was true and plumb before d...
- All main and nose ribs clecoed in position onto th...
- Here, the rib/spar rivet holes on Rib Pair A/C wit...
- Here, the rib/spar rivet holes were drilled with #...
- Note, even the initial 2 index pre-punched holes w...
- Drilling additional 4 holes with #30 bit on the de...
- Flap track guide arm already drilled (Rib Pair B a...
- Flap track guide arm in place and addditional 5 ho...
- All holes completely re-drilled at its 2 pre-punch...
- Drilling the two pre-punched rib web holes using 1...
0 Comments:
Post a Comment
<< Home