Thursday, April 12, 2007

With the entire assembly right side up,the upper surface of the skin was clamped using side grips with the upper spar flange rivet line and centrelines marked on the rib centered under respective pre-punched skin holes. Digital leveler was once again used to check for any twist in the assembly before #40 holes were drilled along the spar.
Posted by Picasa

0 Comments:

Post a Comment

<< Home