Saturday, May 12, 2007
Previous Posts
- All nutplates riveted in position.
- Doing some somersault in riveting nutplates to the...
- Nutplates riveted to nose rib B and C.
- Clecoing the ribs and spar together, as well as th...
- Clecoing the ribs and spar together, as well as th...
- After corrosion proofing...awaiting assembly
- Deburred parts awaiting corrosion proof.
- Dimpling the relevant holes for the nutplates on t...
- Likewise for the upper hinge line of the servo tab.
- The upper hinge line on the aileron were re-drille...
0 Comments:
Post a Comment
<< Home