Wednesday, December 02, 2009

Giving a big thumb up after finished drilling the trailing edge and upsized the rivet hole
of the nose rib to #30.
Posted by Picasa
Finally, drilling the trailing edge of the flap. Proof of me actually doing the hard work.
Posted by Picasa
Here, i am seen using an L-shaped straight edge to align the flap properly before drilling the aft spar using #40 drill bit.
Posted by Picasa
Result of drilling the main rib/nose rib and forward spar.
Posted by Picasa
Here, i drilled the main rib of the starboard flap.
Posted by Picasa
Next, i drilled the nose /leading rib holes using #40 drill bit.
Posted by Picasa
24 Nov 2009.
It has been awhile since i last worked on my project. Today, i continued drilling the upper forward spar of the starboard flap using pneumatic means.
Posted by Picasa

Monday, September 10, 2007

Yes, finally I have finished drilling one set of flap . Gotta deburr , corrosion proof plus rivet it later. One done, one to go.
Posted by Picasa
Last but not least, the trailing edge was drilled with its associated wedge-size spar cap sandwiched in between.
Posted by Picasa
Note the limited clecoes in place though the rear spar rivet holes have been fully drilled.
Posted by Picasa
The upper rear spar was being drilled finally.
Posted by Picasa
Driling the nose ribs with #30 bit except for the far outboard and inboard end due to accessibility to hand riveting at a later stage.
Posted by Picasa
Done.
Posted by Picasa
Now drilling the upper main rib from fore to aft starting from the front spar.
Posted by Picasa
Thumb up for another good job.
Posted by Picasa
Confirm trice.
Posted by Picasa
Confirm twice.
Posted by Picasa
Confirm once.
Posted by Picasa
Drilling on the upper front spar began after checking alignment w/ my digital leveler.
Posted by Picasa
Now, the flap was flipped right side up and bounded tightly with few nylon straps.
Posted by Picasa
Taking time to take a photo after hard work in drilling. Note, i have transfered all clecoes from main ribs to nose ribbs due limitted no. of clecoes i have.
Posted by Picasa
Followed by lower the nose ribs.
Posted by Picasa
Main ribs being drilled..
Posted by Picasa
Mission completed.
Posted by Picasa
Now the rear spar ...
Posted by Picasa